See How Our New Practice Is Taking Shape
14 July 2026
We first viewed the premises in March and, since then, much of our time has been spent working through the legal process. It has certainly tested our patience, but we are now hoping to collect the keys on 29 July allowing us to begin transforming the building into the multi disciplinary referral practice we have been planning.
There is a great deal of work ahead, but it will be worth the wait. Every aspect of the practice is being designed specifically for microscope endodontics, creating an environment that benefits both our patients and our referring dentists.
During the fit-out we hope to host a number of informal open evenings and introductory seminars, giving colleagues the opportunity to see the practice taking shape before we officially open.
20 July 2026
As things develop in the fit out I shall post images and updates here. Keep looking!
Announcements of seminars and open evenings also will be here.
Currently it's waiting for us to get the keys to get started. I've spent 20 years plus studying how to design things to make an ergonomic microscope centred practice, this is going to be something worth waiting for.
30 July 2026
Significant day today, we got they keys 🙂 Visits by building team, Openreach and Signwriters. Also completed my temporary office.....
Having spent a day here now, it\s lovely and peaceful, little shop 5 mins walk away. and a mobile food truck that sells Hollands Pies. Heaven.
Huge task ahead to make it what we want, but we are up to it.
13 August 2026
Things really got going today. Builders ripping pout the interior of what become the clinical area, ceiling floor, wall to go soon. Even in 38 degs outside heat the airocn was doing it's job. I will however be putting in 2 more units so recpetion, each surgery and each of the education centre rooms has it's own feed.
First batch of signs went up, and obselete ones removed, no more missed deliveries.
20 August 2026
Things progressing nicely. The huge reinforced wall is now gone, 3 skips full, was a strongroom for CCTV monitoring previsoulsy, hence the rebar etc. Big job. Now we are onto first fix electrics and aircon. Upstairs I have all the bits I need to build my modular surgeries, just slowly going through assembling this, and will build up as and when time alows. Projector will go up when I get electricial to put power to it discreetly along with HDMI cables, and I'll begin setting up the sound system in the education centre as well.
New website is looking lovely, be live in a few weeks, same functionality, just a crisp clean vibe to it.
25 August 2026
Lots of progress, new aircon system almost done, stud walls very much progressing, can start to see the layout deveoping.
4 September 2026
Little slower this week, but gave me time to finish putting the screen together for the Education Centre and get that mounted, as well as configuring the sound system for that room, For patient relaxation we will have proper speakers built into the new ceiling , no 20 year old radios on the counter top. Well, no counter top either!
10 September 2026
Taking shape now, almost ready for plastering. clinical corridor with 2 large operatories on the LHS with CBCT between them, decon on the RHS and then large door into patient reception area.
We first viewed the premises in March and, since then, much of our time has been spent working through the legal process. It has certainly tested our patience, but we are now hoping to collect the keys on 29 July allowing us to begin transforming the building into the multi disciplinary referral practice we have been planning.
There is a great deal of work ahead, but it will be worth the wait. Every aspect of the practice is being designed specifically for microscope endodontics, creating an environment that benefits both our patients and our referring dentists.
During the fit-out we hope to host a number of informal open evenings and introductory seminars, giving colleagues the opportunity to see the practice taking shape before we officially open.
As things develop in the fit out I shall post images and updates here. Keep looking!
Announcements of seminars and open evenings also will be here.
Currently it's waiting for us to get the keys to get started. I've spent 20 years plus studying how to design things to make an ergonomic microscope centred practice, this is going to be something worth waiting for.
Significant day today, we got they keys 🙂 Visits by building team, Openreach and Signwriters. Also completed my temporary office.....
Having spent a day here now, it\s lovely and peaceful, little shop 5 mins walk away. and a mobile food truck that sells Hollands Pies. Heaven.
Huge task ahead to make it what we want, but we are up to it.
Things really got going today. Builders ripping pout the interior of what become the clinical area, ceiling floor, wall to go soon. Even in 38 degs outside heat the airocn was doing it's job. I will however be putting in 2 more units so recpetion, each surgery and each of the education centre rooms has it's own feed.
First batch of signs went up, and obselete ones removed, no more missed deliveries.
Things progressing nicely. The huge reinforced wall is now gone, 3 skips full, was a strongroom for CCTV monitoring previsoulsy, hence the rebar etc. Big job. Now we are onto first fix electrics and aircon. Upstairs I have all the bits I need to build my modular surgeries, just slowly going through assembling this, and will build up as and when time alows. Projector will go up when I get electricial to put power to it discreetly along with HDMI cables, and I'll begin setting up the sound system in the education centre as well.
New website is looking lovely, be live in a few weeks, same functionality, just a crisp clean vibe to it.
Lots of progress, new aircon system almost done, stud walls very much progressing, can start to see the layout deveoping.
Little slower this week, but gave me time to finish putting the screen together for the Education Centre and get that mounted, as well as configuring the sound system for that room, For patient relaxation we will have proper speakers built into the new ceiling , no 20 year old radios on the counter top. Well, no counter top either!
Taking shape now, almost ready for plastering. clinical corridor with 2 large operatories on the LHS with CBCT between them, decon on the RHS and then large door into patient reception area.